STANMECH Technologies Inc.
  • Home
  • Equipment Supply
    • Flooring
    • Geomembrane
    • Industrial Fabrics
    • Manufacturing
    • Plastic Fabrication
    • Roofing >
      • Distributors
  • Engineering Services
    • Engineering Services
    • Deflashing Systems
    • Drying Bottles & Cans
    • Heat Systems
    • Shrinking Labels
  • Repair
    • Repair Service
    • John's Tech Tips
  • Resources
    • Articles
    • Case Studies
    • Engineering Information
    • Whitepapers
  • About
    • About Us
    • Technology Providers
  • Contact

ASTRO Tech Tips

4/25/2017

 
ASTRO Wiring Instructions
Please consider the following when connecting a new plug to your ASTRO:
  • Specifications of the plug: 15 Amp; 250 Volt; 2 pole; 3 wire; grounding; twist-lock
  • When using a generator make sure the plug is wired for A/C

Connecting a twist-lock plug:
  • Connect the green wire to the pin with the bent tab
  • Connect the white wire to one of the pins directly left or right of the bent tab
  • Connect the black wire to the other pin directly left or right of the bent tab

Please consider the following when making an extension cord for your ASTRO:
  • Use a 12 Gauge or thicker cable if you plan to make a 100 ft or longer extension cord
Generator Instructions:
  • Starting procedure:
    1. Switch on the generator
    2. Switch on the ASTRO
  • Shut-down procedure:
    1. Switch off the ASTRO
    2. Switch off the generator

Comments are closed.
    This section is designed to provide our customers with some quick tips for common problems they may encounter with their tools. Our tips come straight from John Wesselson, our repair technologist.

    Tools

    All
    Air Heaters
    ASTRO
    BITUMAT
    COMET
    FUSION
    GHIBLI
    GROOVER
    HOTWIND
    SARNAMATIC
    TRIAC
    TWINNY T
    UNIFLOOR
    UNIPLAN
    UNIROOF
    VARIANT T1
    VARIMAT
    VULCAN
    WELDMAX
    WELDPLAST

      Submit a Tech Tip

    Submit
STANMECH Technologies Inc. 
​944 Zelco Drive Burlington ON L7L 4Y3 | 1-888-438-6324 | info@stanmech.com
Terms of Use    Privacy    Terms and Conditions of Sale
Français

Proud Member of:
IFAI Logo
Industrial Fabrics Association International
IAGI Logo
International Association of Geosynthetic Installers
PEO Logo
Authorized by the Association of Professional Engineers of Ontario to offer professional engineering services. 
  • Home
  • Equipment Supply
    • Flooring
    • Geomembrane
    • Industrial Fabrics
    • Manufacturing
    • Plastic Fabrication
    • Roofing >
      • Distributors
  • Engineering Services
    • Engineering Services
    • Deflashing Systems
    • Drying Bottles & Cans
    • Heat Systems
    • Shrinking Labels
  • Repair
    • Repair Service
    • John's Tech Tips
  • Resources
    • Articles
    • Case Studies
    • Engineering Information
    • Whitepapers
  • About
    • About Us
    • Technology Providers
  • Contact